Erp Home Projects Project Windpark Erftstadt-Erp Windpark Erftstadt-Erp (Germany) Construction period: Three monthsExecution year: 2025Client: GreenPlanetProjectsAddress: 50374 Erp (Germany) ROAD WORKS Six new and clean power generators shall be built. The areas are recorded. Fully mobilized! Start of road works! The soil is removed gently and evenly. Prooved deformation modulus EV2 >55 MN/m² on Geocomposite Combigrid GRK 4c and gravel layer. Demand roads/areas 25.000 m² Far more than 1.000 truck loads of gravel. Places are leveled to horizontal zero with grader. Long access roads are being built. Geotextile technology for very high load capacities. Curve radii are being expanded. Foundation pits started to be prepared. Base layer is executed. The anchor rods are mounted on the flange. The steel bars are put very exactly to its correct position. The first out of six foundations is casted. Nice top fiew of the foundation.